EDUCATION:
Drexel University, BSCE Structural Engineering, 1966
Lehigh University, MSCE Structural Engineering, 1972
REGISTRATION:
Professional Engineer:
West Virginia (14540)
Pennsylvania (PE-021579-E)
Ohio (E-54858)
Virginia(042 036109)
Maryland (16230)
MEMBER:
NSPE, ASCE, AISE
SPECIALTIES:
- Bridge design and inspection
- Management of large design projects
- Fatigue analysis
- Structural forensic evaluations
- Industrial crane runway design, inspection and re-rating
- Cost effective rehabilitation and renovation of structures
- Retaining walls
- Personnel development
- Team building
Mr. Dickey has 36 years of experience in structural engineering with an emphasis on the inspection, analysis, and design of highway bridges, industrial buildings, overhead craneways, and special structures. Prior to joining LA Gates Company, Mr. Dickey was Manager, Structural Services for a large consulting firm in Rochester, New York supervising design and preparation of contract documents for new bridges and bridge rehabilitations in several states. He served as Project Manager for the $50M Stutson Street Bascule Bridge replacement project. This multi-disciplined effort involved supervision of 5 sub consultants as well as in-house staff in three offices. He also served as Project Manager for all structural work on the new $65 million Corning Bypass, which included 12 new bridges, a pedestrian tunnel and two hydraulic structures. The historic Main St bridge over Keuka Lake Outlet restoration project, that he managed, won an AASHTO Award in 1999. For several years Mr. Dickey also directed the efforts in the City of Rochester's bridge program, which involves the annual inspection, rating, repair and maintenance of some 40 bridges and tunnels under sole and shared ownership of the City.
Prior to his tenure in consulting engineering, he was a Senior Consulting Engineer with Bethlehem Steel Corp., involved in the analysis, rehabilitation, and design of many overhead craneways, heavy industrial buildings, bridges and various steel plant equipment components.
EXPERIENCE:
BRIDGES
- Stutson
Street Movable Bridge Replacement Project, NYSDOT, Rochester,
NY
- Route 28 over Academy Street
Bridge Replacement, NYSDOT, Pine Hill, NY
- Route 78 over Buffalo Creek
Bridge Replacement, NYSDOT, Wales, NY
- Veteran's Memorial Bridge
Rehabilitation, NYSDOT, Rochester, NY
- Main Street Bridge over Keuka
Outlet Bridge Rehabilitation, NYSDOT, Penn Yan, NY
- The Corning Bypass, NYSDOT,
Corning, NY (12 new bridges)
- Route 39 over Trout Brook
Bridge Replacement, NYSDOT, Town of Pike, NY
- Route 63 over Canaseraga Creek
Bridge Replacement, NYSDOT, Livingston County, NY
- City Bridge Program, City
of Rochester, NY
- Replacement of Four Bridges,
West Virginia Department of Highways
- Inspection and Rating of Three
Bridges, Pennsylvania DOT
- NYSDOT Level I Load Rating,
Rochester, NY
- Route 101 Improvements, Epping-Brentwood,
NH
- Exchange St. over Susquehanna
River Bridge Rehabilitation, NYSDOT, Binghamton, NY
- NYSDOT Local Bridge Inspection,
Region 4
- Flood Damaged Bridge Rehabilitations,
West Virginia DOH
- Arch Bridge Load Ratings,
PennDOT, Lackawanna and Wayne County, PA
- South Washington Street Bridge
Rehabilitation, NYSDOT, Binghamton, NY
- Route 13 and Route 4 Bridge
Level I Ratings, PennDOT, Wyoming and Luzerne Counties
- Fracture Critical Bridge Inspections,
NYSDOT, Regions 3, 7 & 9
- Bethlehem Steel Rail Bridge
Rehabilitation Project , Johnstown, PA
- NY Route 214 over Stony Clove
Creek, NYSDOT, Phoenicia, NY
- Jamaica Bay Swing Bridge Rehabilitation
, NYC Transit Authority, New York, NY
- Switzer/Monty
Brothers Bridge Replacement, Logan County, West Virginia,
West Virginia Department of Transportation
- Beckley By-Pass
Bridge over Cranberry Creek, Raleigh County, West Virginia,
West Virginia Department of Transportation
- Interstate Route
77 Over West Virginia Route 34, Kenna I/C Bridge #2179,
Jackson County, West Virginia, West Virginia Department
of Transportation
- Logan Bridge
No. 4, Logan, West Virginia, West Virginia Department
of Transportation
- Main Street
Bridge Replacement, Pine Grove, Wetzel County, West Virginia,
West Virginia Department of Transportation
BUILDING & SPECIALTY STRUCTURES
- Information Services Building, Bethlehem Steel Corp, Sparrow's Point,
MD
- J.A. Baker Institute Addition, Cornell University, Ithaca,
NY
- WSKG Television Studio Design/Build Conversion, Binghamton, NY
- Taylor Packing Company Meat Processing Plant Additions & Renovations, Wyalusing,
PA
- Wyoming Valley Pump Station Modifications, US Army COE, Wilkes-Barre,
PA
- Pollution abatement stacks on roof of Kodak Building #53, Rochester,
NY
- Lever beam design for lifting 90 ton reel of wire rope. Williamsport, PA
- Load factor evaluation of overloaded roof trusses at Xerox Building #204, Rochester, NY
- Xerox toner manufacturing facility expansion. Rochester,
NY
FORENSIC EVALUATION
- Storage Building Timber Truss Roof Collapse, Williamsport,
PA
- Kemper Arena Roof Collapse, Kansas City,
MI
- Maines Building Roof Collapse, Binghamton,
NY
- Clarence Mall Roof Collapse, Clarence,
NY
- Cowanesque Lake, Low Flood Gate Failure, US Army Corps of
Engineers
- Numerous Structural Failures due to Fatigue and/or High Temperature, Bethlehem Steel Corporation, Various
Plants
HEAVY INDUSTRIAL BUILDING
- Corporate wide investigative study of recurrent crane rail weld
failures
- Rerate and stability analysis for 15T gantry crane. Fairfield,
MD
- New 160 foot, 10 ton capacity outdoor crane runway
extension, Fairfield, MD
- Detailed field inspection and fatigue analysis overhead Bar Mill
conveyor, Lackawanna, NY
- Remediation for cracking distress in a 300 ton shipyard gantry
crane, Sparrows Point, MD
- OSHA required crane side pull
evaluation, Williamsport, PA
- Remediation of cracks in the pin plates of the BOF teeming crane lift
beams, Lackawanna, NY
- Strain gauge instrumentation study for mill crane impact
magnitude Lackawanna, NY
- Engineering evaluation used to
successfully reduce an OSHA citation for shipping aisle crane overload from "Willful" to "Serious," Bethlehem, PA
- In-depth study of the soaking pit cranes and
runway Bethlehem, PA
- Rerating of elderly riveted Forging Division craneway from 200 to 300
tons Bethlehem, PA
- Redesigned teeming cranes ladle hooks to increase available
payload Steelton, PA
- Repair and rehabilitation of elderly riveted teeming aisle mill
building Johnstown, PA
- Cumulative damage fatigue evaluation of Electric Furnace runway
girders Steelton, PA
- BOF
Charge Aisle runway rerate from 350 to 425
tons Burns Harbor,
IN
- Continuous
Caster crane and runway rerate from 60 to 90
tons Burns Harbor,
IN
- Plate
mill slab yard crane runway rehabilitation and
rerate, Sparrows Point, MD
- Truss
Design to support 425 ton ladle crane runway for the removal of two columns for a transfer