Description:
The new Switzer/Monty Brothers Bridge is a replacement
for the aging existing bridge. The bridge carries Route 44 traffic
over Island Creek.
Superstructure:
This bridge has 3 spans at 45-58-46
for a total bridge length of 149. The alignment includes
a horizontal curve as well as a turn lane at one end of the bridge.
The bridge is 39-3 wide which includes a 5-0
wide sidewalk. Modular Expansion Dams were used to accommodate
the expansion and contraction. The girders rest on steel reinforced
elastomeric bearing pads.
Substructure:
Abutment 1 is supported by piles and both piers
and Abutment 2 are on spread footings. The substructure units
are on a 60 degree skew as well as being on a ±6 degree
horizontal curve.
Special Considerations:
- Complicated geometry
in this structure made the design
especially challenging. The combination of skewed piers and
abutments, curved girders, and a turn lane at one end made
for a difficult design.